API specification l80 eue 8rd tubing nipple
Get Latest PricePayment Type: | L/C,T/T,D/P,D/A,Paypal |
Incoterm: | FOB,CFR,CIF,EXW |
Min. Order: | 10 Metric Ton |
Payment Type: | L/C,T/T,D/P,D/A,Paypal |
Incoterm: | FOB,CFR,CIF,EXW |
Min. Order: | 10 Metric Ton |
Place Of Origin: Cambodia
Applicable Industry: Energy &Amp; Mining
Grade: API J55, API L80, API J55-API P110
Secondary Or Not: Non-secondary
Application: OIL PIPE
Alloy Or Not: Is Alloy
Section Shape: Round
Outer Diameter: 60.32 - 114.3 mm
Surface Treatment: Other
Certification: API
Length: R1,R2
Selling Units | : | Metric Ton |
The file is encrypted. Please fill in the following information to continue accessing it
api spec 5ct TUBING nipple l80 eue 8rd Tubing Pup Joint
Classification and main differences of steel pipes in API standards for steel pipes for oil and gas transportation
According to API SPEC 5L, steel pipes are divided into PLSL and PLS2 product grades, and different technical conditions are specified for these two types of products. The main difference is that the strength requirements for carbon equivalent, fracture toughness, maximum yield strength and maximum tensile strength are specified relative to PLS1 and PLS2. The control of harmful elements such as sulfur and phosphorus is also more strict: nondestructive testing of seamless tubes has become a mandatory requirement. The contents that must be filled in the warranty and the traceability after the test become mandatory requirements.
Tubing is pipe used for the transportation of crude oil and natural gas from an oil or gas layer to the surface after drilling is complete.
It is made to withstand the pressure generated from the extraction process.
Standard | API 5CT |
Size | 2 3/8", 2 7/8", 3 1/2", 4 1/2" |
Steel grade | J-55, L-80, N-80, C-90, T-95, P-110 |
Type | NUE, EUE |
Length | R1, R2 |
FAQ
Q1: How long is your delivery time?
According to the quantity of per size.Generally it is with 7 days if the goods are in stock,or it is 15-20 days if the goods are not in stock.
Q2: Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q3: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
B:100% L/C at sight.
C:30% advance payment ,70% L/C at sight.
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.